PROCESSING
Thin Film Coatings
![](/uploads/editor/files/AME-02s.jpg)
Optical thin film coating is conducted by professional engineers via vacuum coating equipment. Through successive monitoring and control scheme, sequential inspection is applied to ensure product quality.
The equipment in the factory is as follows:
The equipment in the factory is as follows:
- 5 automatic evaporation machines.
- High-precision reflective optical monitor system for thin-film thickness
- Automatic high-energy ion sources (to enhance film hardness).
- Japan PLASMATECH electron gun G-12100.
Process Introduction
![](/uploads/editor/files/stepA_01.jpg)
Step1
Lapping
![](/uploads/editor/files/stepA_02.jpg)
Step2
Polishing
![](/uploads/editor/files/stepA_03.jpg)
Step3
Washing
![](/uploads/editor/files/stepA_04.jpg)
Step4
Coating
![](/uploads/editor/files/stepA_05.jpg)
Step5
Spectrum Check
![](/uploads/editor/files/stepA_06.jpg)
Step6
Wire Saw
![](/uploads/editor/files/stepA_07.jpg)
Step7
Inspection / Ink
![](/uploads/editor/files/stepA_08.jpg)
Step8
Assembly
Evaporation machines
![](/uploads/editor/files/APP-01s.jpg)
![](/uploads/editor/files/APP-02s.jpg)
![](/uploads/editor/files/APP-03s.jpg)